TERRA was retained by the City of Berwyn to create a streetscape through their historic Depot District area. Work includes upgrades to their water and sewer system through the area. A Phase I Project Development Report will be completed prior to design. Full topographic survey, geotechnical investigations and traffic studies will be a part of the design.

A drainage study was conducted to identify problem areas prone to flooding. Coordination with Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) is required to identify capacity in MWRDGC’s system as well as the design of a tie-in to the system with a 30-foot-drop manhole.

The streetscape will incorporate sustainability measures including permeable pavers, bioswales and other best management practices.

Clients

City of Berwyn