TERRA completed an analysis of the Village of Matteson’s existing water distribution system and recommended a new 3.0-MG at grade water tank to provide storage for the Village based on projected future domestic and fire water supply demands.

TERRA provided civil engineering design and field observation services for the construction of the new 3.0-MG water tank. Construction on the water tank began in the summer of 2006 and finished in the summer of 2007.

Client

Village of Matteson